Barrow Woodlands

The works comprise excavation and clearance work, drainage and hard landscaping including the laying of new surfacing, re-building of stone walling together with the construction of a disabled car park.

The contract included two main areas of work:

A stepped entrance to Abbotswood comprising timber steps on concrete foundations and footpath; a disabled capr park at Millwood comprising excavation, drainage and macadam surfacing together with kerbing and timber edgings together with a fibredec surface treatment; the main footpath at Abbotswood