Defence
September 19, 2019
Print this page

Car Park 3A Upgrade and Road Remediation, Lancashire

The works were undertaken on behalf of BAe Systems Limited and comprised the design and construction of the upgrade to an existing temporary car park to provide a permanent parking facility. Works include the installation of drainage, lighting, kerb lines, tarmac surfacing and line marking.

The contract also included the resurfacing of an existing roadway and reinstatement of footpaths by installing new kerbs and surfacing.

A new speed table was also replaced to meet current guidelines.

< Back to Previous Page