The main tasks included in the Framework include Piling works including sheet piling, bored piling and contiguous piling, earth embankments for flood defences, concrete structures ie outfalls, abutments, hard flood banks, culverts, wave return walls and retaining walls. Rock armour works and erosion protection, revetment works using stone and natural products, concrete blockwork, dredging and channel excavation and geotextile solutions. Culverts and drainage, weirs, flumes, gauging stations and fish passes. Minor building works including telemetry kiosks.
< Back to Previous PageThe completed works at Close Lane, Alsager is very good and was very efficiently and effectively carried out.
Tom Stockton – United Utilities