Environment
February 19, 2019
Print this page

Warrington South WwTW

William Pye Limited designed and constructed a new pumping station which re-routed surplus activated sludge from a small pumping station to a position upstream of the primary tanks distribution chamber. The pumping station was a 3m diameter PCC chamber 3m deep.

The pumping system was designed in house in conjunction with WH Good Ltd and was a duty standby pump system. The main was an 80mm pump main and was 80m long. All electrical work was carried out by WH Good Ltd.

< Back to Previous Page