New Contract Award! – Hyde 132kV Substation
Hyde 132kV Substation
William Pye Limited has been awarded a contract by Electricity North West Limited to carry out Civil Engineering works at Hyde Substation in Greater Manchester.
The purpose of the project is to replace the existing GT1 & GT2 circuits at Hyde 132kV
Substation.
The project is to be phased and include demolition of existing structures and foundations.
Work elements include:
• Welfare to be set-up in north east corner of the site.
• Existing site boundary to be extended to create new site boundary.
• New site boundary to be electrified palisade fencing with concrete kerb and retaining
wall.
• Install new drainage run for both new transformer bunds.
• Compound levels to be made up and create new access road.
• Construction of new piled GT2 transformer bund and circuit.
• Installation of multicore cable ducts & draw pits and connection to previously installed
drainage.
• Make good dilapidated during construction and finish with 75mm limestone.
• Installation of 1No. Lamp standard.
• Demolition of existing GT2 circuit, acoustic enclosure.
• Construction of new piled GT1 circuit and Transformer bund.
• Installation of multicore cable ducts, draw pits and connection to previously installed
drainage.
• Make good dilapidated during construction and finish with 75mm limestone.
• Finish and make good new access road.
Works are due to commence in May 2013 and completed by early 2014
< Back to Previous Page“A lot of thought went into the method but I particularly wanted to acknowledge the professional and skillful manner in which the operatives went about their work in less than favorable conditions. They had a good grasp of the safety and operational issues and the concerns of UUE were taken on board very responsibly.”
Bob Peck, Director – MMC